In this guide
Short answer: To open a restaurant in Dubai, you need two parallel tracks: a trade license with a specific food activity from the Department of Economy and Tourism (or the free zone authority if the site is in one), and approvals from the Food Safety Department of Dubai Municipality. The Food Code requires the layout of a new or renovated food establishment to be approved before construction, and the establishment to be inspected before it operates. Since 20 December 2024, food permit applications are submitted through the Municipality website instead of the Food Watch platform, which remains in use for registration. Other approvals are added depending on the site, such as Civil Defense and shop signage. No single official timeline is set for all this; it depends on how ready the site is.
Summary
| Item | Details | Source |
|---|---|---|
| License | A trade license with a food activity, specified precisely | Dubai Municipality / Department of Economy and Tourism |
| Layout approval | Before construction or renovation, from the food control department | Food Code, Dubai Municipality |
| Registration and inspection | The establishment is registered and inspected before operating | Dubai Municipality |
| Permit applications | Through dm.gov.ae since 20 December 2024, and Food Watch for registration | Dubai Municipality |
| A "restaurant management" license only | Not enough for Food Watch registration or food permits | Dubai Municipality |
| Fees | Shown on the platforms when you apply, and may change | Competent authorities |
The steps in practical order
- Define the concept and activity precisely: a restaurant with a full kitchen differs from a cafe, a cloud kitchen or a catering service. The Municipality states that the activity on a food establishment's license must be food-related and stated precisely.
- Choose the legal form and route: most restaurants serving the public in Dubai are licensed on the mainland. Compare the forms in the limited liability company guide and the sole establishment guide.
- Reserve the trade name and obtain initial approval through the Invest in Dubai platform.
- Choose the site before signing for good: make sure the property allows restaurant use, and that ventilation, drainage and emergency exits are available. Read the company office and Ejari guide.
- Get the layout approved by the Municipality before construction: the Food Code requires the proposed design of a new or renovated food establishment to be approved before works begin. Any work done before approval may mean redoing it.
- Carry out the fit-out according to the approved layout, then complete any other site approvals the authorities require (such as Civil Defense).
- Issue the trade license once the required approvals and lease are in place.
- Register the establishment and request inspection: the establishment is registered and inspected, then food permit applications are submitted through the Municipality website.
- Prepare your team: employees who handle food have training and health certificate requirements set by the Municipality.
- Start operating once approvals are complete, and make sure to renew the license and permits every year.
Approvals you may need depending on your restaurant
| Case | What may be added |
|---|---|
| Restaurant in a mall | The mall management's requirements and design approvals |
| Delivery with your own vehicles | Food transport permits from the Municipality |
| Sign on the storefront | A signage permit from the competent authority |
| Central or cloud kitchen | A different activity and special site requirements |
| Selling imported packaged products | Product registration and import requirements. See the import and export guide |
Taxes and operations after opening
- VAT: if your taxable sales exceed the mandatory threshold (AED 375,000 in 12 months), registration is required. Read the VAT guide.
- Corporate tax: a separate registration within the deadline from the date of incorporation. Read the corporate tax guide.
- Renewal: the license, Ejari and food permits all renew, and a problem with one holds up the others.
What changes in your case
- Investor nationality: foreigners can own many activities, but check the activity list on the Invest in Dubai platform. UAE and GCC nationals have special routes such as Intelaq.
- Location: the mainland, a free zone with its own licensing authority and food rules, or a mall.
- Activity: a full restaurant, a cafe, a cloud kitchen or catering.
- Size: determines the number of employees, visas and kitchen space.
- Brand: a franchise of an existing brand needs a documented agreement and approval of a name that matches the rights.

Common mistakes
- Starting the fit-out before the Municipality approves the layout.
- A license whose activity is only "restaurant management" with no food activity, which makes it impossible to obtain permits.
- Signing a long lease at a site that does not meet kitchen requirements.
- Estimating the setup budget from circulating figures with no source.
- Neglecting food safety training for staff until the inspection date.
- Forgetting tax registration once sales grow.
Frequently asked questions
Is a Department of Economy and Tourism license enough to open a restaurant? No. You also need approvals from the Food Safety Department of Dubai Municipality, which states that a food activity on the license is a condition for obtaining its permits.
When do I get the restaurant layout approved by the Municipality? Before construction or renovation, under the Food Code, which requires the proposed layout of new or renovated food establishments to be approved.
Where do I submit food permit applications now? The Municipality announced that permit applications have not been accepted through Food Watch since 20 December 2024 and are now submitted through dm.gov.ae, while Food Watch remains for registration.
How much does it cost to open a restaurant in Dubai? There is no comprehensive official figure. The platforms show government fees when you apply, and the largest part is usually site rent and fit-out. Read the Dubai setup cost guide.
Can I open a restaurant in a free zone? It is possible in zones that allow the activity, at their locations, but restaurants serving the city's general public are usually licensed on the mainland.
How long does licensing take? The authorities do not announce a single timeline; it depends on how ready the site is, layout approval and inspection.
Official sources
| Source | Link | Last review |
|---|---|---|
| Dubai Municipality: important information for food establishments | https://www.dm.gov.ae/municipality-business/food-safety-department-2/important-information-to-food-establishment/ | 14 November 2026 |
| Dubai Municipality: Food Code | https://www.dm.gov.ae/wp-content/uploads/2024/10/Food-Code-2013-English.pdf | 14 November 2026 |
| Dubai Municipality: Food Watch | https://foodwatch.dm.gov.ae/ | 14 November 2026 |
| Department of Economy and Tourism: business licensing | https://www.dubaidet.gov.ae/en/licences-and-permits/business-licensing | 14 November 2026 |
| Invest in Dubai platform | https://app.invest.dubai.ae/ | 14 November 2026 |
This is general information for awareness, not legal advice. The competent official authority makes the final decision, and requirements may change.
Let NOSOB handle it for you: You focus on the kitchen and the menu, and our team handles the license, the transactions and the follow-up with the authorities for you as fast as possible, with licensed partner lawyers, formation consultants and our representatives in the UAE. Start with the UAE offer: your trade license within 20 days or the Set up your company in Dubai package. Book a consultation.